Case Study: Engine Line Install

Photo illustrating best case "Paintshop Management & Technical Cleaning"

The assignment

Greenfield installation of customer equipment into AE facility.

The challenges

  • Piston line
  • Head line A (DI)
  • Head line B (over/under conveyor)
  • Block line A + B
  • Main line A-D
  • 8 Mezzanines
  • 16 Elevators
  • Approximately 100 robots
  • 86 Automatic stations
  • 1 Nut runner to be located from Plant 2

Your message

Want to learn more? Contact us

* mandatory